Please go thru below JD carefully and relevant candidates only share cv thru below email only -
gulam.r@ja-hr.com
ELECTRICAL AIS & GIS
SUBSTATION PROJECT
SYSTEMS AND MATERIALS
1) ELECTRICAL MATERIALS
a. GIS Equipment’s (380kV, 132kV etc.,)
b. GIBD (Gas Insulated Busducts)
c. GIS LCC (Local Control Cubicle)
d. Power Transformers
e. Shunt / Bus Reactor
f. Capacitor Bank
g. 33kV & 13.8kV MV Switchgears
h. Solid Insulated
i. Auxiliary Transformer / Station Service
Transformers (SST)
j. Grounding Transformer
k. Neutral Grounding Resistor
l. RMU (Ring Main Unit)
m. AIS Equipments like CB, Isolators, CT,
VT/PT, CVT, Wave trap, Surge Arrestor,
Earth Switch etc
n. Steel Lattice Structures for Substation
Equipments
o. Steel Structural Gantries
p. AC/DC Distribution Panels
q. AC/DC Lighting Panels
r. HV Power Cables
s. MV Power Cables
t. LV Power Cables
u. LV Control Cables
v. Instrumentation & Communication
Cables
w. Lighting Cu. Wires (1.5/2.5/4/6 Sq.mm)
x. G.I/Aluminium Cable Trays (Ladder &
Perforated Type)
y. Cable Raceways
z. Lighting & Power Receptacles
aa. Industrial Plugs & Sockets
bb. Switch & Sockets
cc. Lighting Fixtures
dd. Lighting Masts / Poles
ee. Shielding Mast
????. Cable Glands & Lugs
gg. End Termination Kits
hh. Straight Through Joint Kits
ii. Cable Sealing Ends for MV Cables
jj. Battery & Battery charger
kk. Earthing & Grounding materials like
G.I/Cu. Earth Flat/Rod, Bare Cu.
Conductor, Grounding Conductor
List of other Electrical Systems and its Panels
i. SAS System
ii. SCADA System
iii. Control & Protection System
iv. AMI / Revenue Metering & Annunciation
System
v. Cyber Security System
vi. Telecommunication System
vii. ELV System (CCTV, ACS, PAS/PAGA, LCS,
LAN/WLAN)
viii. Online PDMS System for GIS
ix. Hot Spot Temperature Monitoring System
for Power Transformer
x. Solid Insulated Busbar (SIB) System for
MV Switchgear
Page 2 of 2
2) MECHANICAL MATERIALS
a. HVAC – PACU
b. HVAC – Ducts
c. HVAC – Fans
d. HVAC – DDC Control Panels
e. Fire Detection / Fire Alarm System
f. Electrical Pumps for FPS System
g. Fire Suppression System (FM200)
h. Electric Overhead Travelling Crane
(EOT Crane)
3) CIVIL & STRUCTURAL MATERIALS
Familiar with Electrical Substation
Building of following types
a. Cast-in-place Concrete building
b. Precast Concrete Building
c. Steel PEB frame with CMU wall
cladding
Strong knowledge of Document Management & Records ControlProficiency in Tally Accounting SoftwareGoo
Review shop drawings and as-built drawingsFilipino Civil Engineer - Technical EngineerPerform quanti
Urgent requiqrementManpower Requirements?? cost control engineerDuration: Long termWhatsApp of Your
we are looking for well experienced Electronics Engineers & Technicians. Minimum requirement is up t
????* Electrical QC Engineer*Rate: after testSALARY : 2 month 20 day????Documents: CV NORMAL*Absher
location as per project dammam or jubailMinimum 5 year Experience in any fieldSAP Knowledge mustBach
For Mosanada ProjectRequirements:Bachelor Degree in Agricultural EngineeringMinimum 1 year experienc
POSITION : LEAD MECHANICAL ENGINEERMINIMUM 12 TO 15 YEARS OF EXPERIENCE REQUIRED(Must have power pla
URGENT HIRING – LOCAL TRANSFER | SAUDI ARABIA - RIYADHWe are looking for experienced professionals