Back To Main Jobs

SITE ELECTRICAL ENGINEER


Job description

Work Experience as follows.

? By Hand Work Experience for 10 years



On Hand Work Experience: Oil & Gas Petrochemical Company.


Power Transformer Oil Immersed. (Dismantling, Installation, Electrical Testing, Oil works, Troubleshooting)

• Transformer Oil Filtration (including vacuuming/flashing) with maximum rating of 85MVA Power transformer.

• Transformer Oil Regeneration for 85 MVA

• Power Transformer Dismantling works.

• Power Transformer Installation works maximum rating of 85MVA Transformer.

• Performed Electrical Testing of Power Transformer (Insulation resistance, Winding Resistance, Turn Ratio, Tan Delta, SFRA (Sweep frequency response) & DFRA (Dielectric frequency response) maximum rating of 20MVA Power transformer.

• Handled Latest Transformer Test Kit by Megger (TRAX & TDX)

• Rectification of Transformer Oil Leakage Rectification works.

• Replacement of Transformer HV & LV Bushing’s.

• Replacement of Transformer Accessories due to the damage occurs or due to malfunctioning like Gauges (Winding temperature gauge, Oil level indicator, PRD).


• To Perform 110KV Transformer HV Lead Replacement work for all the three phases.

• Analysis of Transformer Oil Analysis report as per the Parameter using Saudi Aramco Standards.



Medium Voltage Power Cable Testing/Assessment from 4.16KV to 36KV.

• Medium Voltage Power cable Testing/Assessment maximum rating 36KV.

1. Insulation Resistance Test.

2. Polarization Index Test.

3. VLF withstands Test.

4. DC-HI Potential Test.

5. Tan Delta Test.

6. Partial Discharge test.

• Handling latest testing equipment of B2, In addition several type of MV Cable testing equipment’s like BAUR, MEGGER etc.

• Cable Fault Locate task until 36KV

• To find fault case has different scenario & tackled all the hurdles.

• To be Performed TDR (Time Domain Reflection).

• Using TDR test, to be able to locate the number of existing Splicing’s in the circuit with distance of each splicing’s.

• Using TDR find several numbers of Hidden Joints which is not shown in the Drawings.

• Cable Route detection test, using latest test equipment SPX RD8000/RD8200.

• Using cable route detection equipment, by injecting the selection of various frequency ratings/levels cable route to be traced from end to end.

• To Perform Identification of MV cable in between multiple number of cables.





Medium Voltage Termination & Splicing work 4.16KV – 36KV

• To Perform & Witness the Medium voltage Termination for Transformer’s, Switchgear, Motor’s.

• To attend multiple types of Terminations.

1. Raychem Straight Type Termination.

2. PFISTERER Plug In Type Termination.

3. Elastimold Dead-Break Termination.

4. Elastimold Load-Break Termination.

• To Perform and witness & attend Medium Voltage Splicing works.

• Attend Splicing for MV Multi core cable & also for MV Single core cable.

• After completion of Splicing perform cable Testing to confirm the healthiness of the circuit including newly installed Joint.

• Selection of Type of Termination & Splicing for Medium Voltage system.




Substation Electrical Equipment. (SS Power system Network 110KV/34.5KV, 34.5KV/13.8KV/4.16KV)

• Experience of Dismantle Substation electrical Equipment’s as follows.

1. Dismantle MV Switchgear.

2. Dismantle MV SF6 Switchgear.

3. Dismantle Maga EDG rated 34.5KV(Emergency Diesel Generator)

4. Dismantle MCC.

5. Dismantle MV VFD.

6. Dismantle Busbar.

7. Dismantle Skid Substation (RMU).

8. Dismantle Power Panels.

9. Dismantle MV/LV Power cable along with terminations from the connecting terminals.

10. Dismantle Dry Type Transformer at the Substation.

• Installed Substation Electrical Equipment’s as follows.


1. Installe MV Switchgear.

2. Installe MV SF6 Switchgear.

3. Installe Maga EDG rated 34.5KV (Emergency Diesel Generator)

4. Installe MCC.

5. Installe MV VFD.

6. Installe Busbar.

7. Installe Skid Substation (RMU).

8. Installe Power Panels.

9. Installe Dry Type Transformer at the Substation.

• To perform Troubleshooting of MV Busduct from Transformer Secondary to Switchgear Incomer.

• Trace out the fault in the Busduct by tracing the Busbar as section by section.

• Installed/Applied Raychem HVBT Sleeve on the Busbar.

• Replacement of MV Spacers of Busbar at the Busduct.

• Testing of Busbar using High Voltage Test equipment for DC-Hipot to confirm the healthiness of the Busbar.

• To Attended Troubleshooting for Flash over MV Panels.

• Dismantle & Re-installed the MV CTs at the Switchgear.

• Dismantle Bus-B whole Bus- Busbar.

• To Perform maintenance work for MV Busbar.

• Install New RMU by dismantling the existing RMU.

• Before dismantling existing electrical system, Study the Existing system by detailed survey of existing MV/LV Power cables. Control cables & Protection Relay settings from the Skid Substation (RMU).

• To Perform Data/Event Extraction from Relay (Only data/event extraction)

• Handle Low Voltage power cable terminations & Splicing.

• Handle Dismantling of LV VFD’s.

• Attend regular Preventive Maintenance of LV VFD’s.



Apply Now    
Problem with this ad?  
12

Job Summary

Job Role : SITE ELECTRICAL ENGINEER

Job Location : Rabigh ,Saudi Arabia

Email : farhanh@mmgroup.com.sa


RECENT JOBS

We are seeking!!
Jubail,Saudi Arabia Listing Id : 62995 Posted : 2026-02-22

???? We’re Hiring! – Join Middle East Contracting Company ????Middle East Contracting Company is

Urgently required: PLANT QC Inspector for
Jubail,Saudi Arabia Listing Id : 62996 Posted : 2026-02-22

Urgently required: PLANT QC Inspectorfor SABIC/Ar-razi Plant with 10 years of shutdown experiencesCr

We need urgently Electrical Engineer for big project of Schneider project.
Riyadh,Saudi Arabia Listing Id : 62997 Posted : 2026-02-22

We need urgently Electrical Engineer for big project of Schneider project.well experiencedwho knows

HVAC ELECTRICAL ENGINEER URGENT REQUIRMENT
Jubail,Saudi Arabia Listing Id : 62998 Posted : 2026-02-22

URGENT REQUIRMENTHVAC ELECTRICAL ENGINEERLOCATION: MAADEN, TURAIFDURATION: LONG TIMERATE: AFTER INTE

Planing Engineer (Mechanical) Urgent Requirment
Jubail,Saudi Arabia Listing Id : 62999 Posted : 2026-02-22

Planing Engineer (Mechanical)Rate : After InterviewWork Location : Jafurahwork Duration :Long TimeFo

Production Engineer Required in Saudi
Riyadh,Saudi Arabia Listing Id : 63000 Posted : 2026-02-22

Production Engineer – FactorySaudi Arabia – Metal FabricationWe are hiring a Senior Production E

We are looking for a Mechanical Planning Engineer
Riyadh,Saudi Arabia Listing Id : 63001 Posted : 2026-02-22

Hello Everyone,We are looking for a Mechanical Planning Engineer for a project in the Eastern Provin

We are looking for urgent as below category.
Jubail,Saudi Arabia Listing Id : 63002 Posted : 2026-02-22

We are looking for urgent as below category.1. HVAC Engineer with Aramco Approved and Experience wor

Civil Supervisor Job in Saudi
Riyadh,Saudi Arabia Listing Id : 63003 Posted : 2026-02-22

A Leading Engineering Consultancy Company is seeking to hire the below position for KSA:Civil Superv

SAFETY OFFICER Required in Saudi
Jubail,Saudi Arabia Listing Id : 63004 Posted : 2026-02-22

SAFETY OFFICER NEBOSH APPROVAL. & TUV CARDExperience in the industrial & SABIC SUTDOWN EXPERIENCELoc